手机博彩软件

        <table id="NnmDP"><select id="NnmDP"><strong id="NnmDP"><optgroup id="NnmDP"></optgroup></strong></select></table><i id="NnmDP"><kbd id="NnmDP"><optgroup id="NnmDP"></optgroup><address id="NnmDP"><label id="NnmDP"><mark id="NnmDP"></mark></label></address></kbd></i>
      • <sup id="NnmDP"><button id="NnmDP"></button><area id="NnmDP"><ins id="NnmDP"><colgroup id="NnmDP"><meter id="NnmDP"></meter><thead id="NnmDP"><thead id="NnmDP"><rt id="NnmDP"><sup id="NnmDP"></sup></rt><rt id="NnmDP"></rt></thead></thead></colgroup></ins><blockquote id="NnmDP"><small id="NnmDP"><strike id="NnmDP"><form id="NnmDP"><td id="NnmDP"><ruby id="NnmDP"></ruby><keygen id="NnmDP"><embed id="NnmDP"></embed></keygen></td></form><dt id="NnmDP"></dt></strike></small></blockquote></area></sup><ruby id="NnmDP"></ruby><dl id="NnmDP"><p id="NnmDP"></p></dl><q id="NnmDP"></q>

        手机博彩软件

        NEWS CENTER
        束缚日报:昆阳路越江大桥主塔“破水而立”
        2019-07-19  

         

        记者 戚颖璞

         

               昨天上午,上海黄浦江上第13座越江大桥——昆阳路越江及配套途径工程的主塔承台施工终了,从水下施工转向水上施工。不久之后,昆阳路越江大桥的水上“雏形”行将出现。
               “破水而立”的椭圆形主塔承台,长46.8米,宽21.2米,面积约867平方米,相当于两个多模范篮球场,是名副其实的“巨无霸”。昆阳路越江及配套途径工程由上海城投公路集团投资、地道股份手机博彩软件承建。据介绍,主塔承台是大桥高136米“钻石型”主塔的根底。
          昨天,主塔承台实现为了第二次混凝土浇筑功课。主塔承台浇筑实现后,大桥打造将转入主塔施工阶段。未来上海市民能更直观地看到大桥逐渐向上“生长”的过程。
          昆阳路越江及配套途径工程曾创下上海工程记载。去年10月末,70根70米长的主墩钢管桩沉桩实现施工,打下踏实基础,总锤击数竟达35万次,同时革新了上海市内河航道桥梁桩基深度和难度的记载。